Challenge

Overview:

The client is a global data centre looking to refurb one of their UK locations.

Client aim:

Client aim was to get the new offices full operational for the team to move it. From meeting to completion in 3 weeks.

Challenges faced by the client:

  • Client needed work to be completed within 3 weeks from date of survey
  • Some works was required over a weekend which included carrying out a cabinet upgrade
  • Client did not have an annotated drawing detailing their existing infrastructure, which made remote support difficult
  • Client needed to know exactly what infrastructure they had in place and where it was to enable remote support

How did we resolve the issues:

  • We worked with our client to create 3 separate smaller quotes within 24 hours which allowed them to be more agile with the sign off process. We then made ourselves available for a Teams meeting to ensure the quotes were understood and ready to be submitted for approval. Once approved, work booked in for the following week.
  • We carried the cabinet upgrade out of hours working from 8:30am to 8pm ensuring no interruption for any staff working during the week. All ports tested and labelled in line with new cabinet.
  • We introduced a clear labelling system combining both existing and new infrastructure. Then created an As-Fit drawing allowing their service desk to be able to remotely support their team.
  • Our on-site engineers captured Serial and Mac addresses for all hardware, digitised them for client enabling them to log in and connect straight away remotely.

Special considerations

  • There were 3 projects to deliver within the time frame
  • Customer was based in the US
  • Collaborating with the service desk team who were unable to attend ensuring the office was fully operational.

Services delivered

  1. Cabinet upgrade – existing cabinet and install two new 42U Cabinets to allow growth.
  2. Cabinet patching – We repatched the network to its exact previous configuration.
  3. Data cabling – for office and warehouse including Wi-Fi Access Points.
  4. Labelling and testing– introducing a clear numbering system combining new and existing infrastructure.
  5. Working at height – using our specialist teams who worked safely at heights of 11m.
  6. First day support – A competent set of hands to help their staff with support upon store opening

Related blogs

Riverside office refit

Riverside office refit

Brief/challenge OverviewThis client is one of the UK’s leading residential property and building management agents. Client aimTo provide data cabling to a brand new office which allowed for a flexible working environment. Client objectives• Collaborative partner•...

read more

Get Updates!

Sign up for our newsletter to keep up to date with our latest projects!

Trustpilot badge

Contact our team