Comms room & data cabinet tidy and maintenance services UK
UK nationwide surveys
Why clients trust 2580
Clients
Projects completed
Year guarantee

Multi-award winning company
As you know your comms cabinet is used to store, orginaise and protect your network equipment. unfortunately, over time you may find you cabinet becomes really untidy, which can be a scary thought should anything go wrong and you don’t know where anything is. Because that could mean significant downtime for your organisation.
So whether your new hardware is too big for your existing cabinet, or you want to test what you have, downsize or you simply want a tidy up, we have a solution that fits your needs. We tailor-make our solutions to fit our clients needs.
Our Packages
SILVER PACKAGE
With this package, we will remove redundant patch leads, redundant kit, and IT hardware and repatch your leads making sure all leads are the same length and labeled clearly.
GOLD PACKAGE
This is our cabling MOT package. In addition to what is offered in our silver package, we will re-terminate your patch panels and re-test your infrastructure, repairing any damaged outlets.
PLATINUM PACKAGE
Sometimes your business will outgrow its current cabinet or the current cabinet capabilities, and so with our platinum package, we will undertake a full cabinet upgrade. We will upgrade the whole cabinet, leaving you with a tidy, well labelled cabinet which will not only run efficiently but will be very pleasing to the eye.
Real world successes

Lorainne Mitchell
We had our network cabling replaced throughout our 331 room hotel and I can only say good things about 2580 Group.
Their team members that were on site for almost four months with us acted professionally and did not interrupt our operation at all.
They work in a very tidy, well organised manner and along with our project manager resolved any issues that came up along the way.
All we can say is that we would have them back in the business any time in the future and if you are looking for a great company to use, they are the ones!
Many thanks 2580 Group!

Lorainne Mitchell
We had our network cabling replaced throughout our 331 room hotel and I can only say good things about 2580 Group.
Their team members that were on site for almost four months with us acted professionally and did not interrupt our operation at all.
They work in a very tidy, well organised manner and along with our project manager resolved any issues that came up along the way.
All we can say is that we would have them back in the business any time in the future and if you are looking for a great company to use, they are the ones!
Many thanks 2580 Group!
Our process
QUERY
Call us to discuss your requirements.
SITE VISIT
Free site visit to assess your infrastructure.
QUOTE
An itemised quote following our site visit.
INSTALLATION
Hassle and disruption free installation.
HANDOVER
Full handover including an owners manual.
2580 have helped dozens of clients maintain their data cabinets so they can have simple, efficient data solutions that support their daily operations.
Cabinet maintenance considerations
What colour are the cabinets?
The standard colours are grey and black.
What is the best time to do cabinets maintenance?
How long will a cabinet tidy or cabinet upgrade take?
How do you label the cables?
We colour code the cables to ensure they are easy to identify when there’s a problem, and high priority cables are usually in red. We then stick a colour code to the cabinet. All this will make it easier to support your infrastructure and reduce your support costs.
How we help clients
42U Cabinet Upgrade with Zero Business Interuption
Client: Selco Builders Warehouse
Location: Kingsbury, London
Brief: To upgrade their cabinet to allow for new hardware and future growth, with the work being carried out in one night, out of hours and with zero business interruption.
Actions: This meant that as the stakes were so high, we prepared for all eventualities; one of which included having a fresh team on site at 6am to handover from the night team, and support the store on opening.
42U Cabinet Upgrade with Zero Business Interuption
Client: SelcoBuilders Warehouse
Location: Kingbury, London
Brief: To upgrade their cabinet to allow for new hardware and future growth, with the work being carried out in one night, out of hours and with zero business interruption.
Actions: This meant that as the stakes were so high, we prepared for all eventualities; one of which included having a fresh team on site at 6am to handover from the night team, and support the store on opening.